TODO: Use a [Quasar Timeline](http://quasar-framework.org/components/timeline.html) widget?
# ATA Engineering, Inc.
San Diego, CA.
Mar 29 - Sept 17, 2010 and Mar 30 - Sept 18, 2009
How I benefited ATA:
- Built finite element models, ran analyses, and post-processed results.
- __Created clear presentations__ for customers explaining the results.
- Communicated closely with the sales team to determine and meet their needs.
- Created an application to track software sales
- During down time, wrote new web-based tools to run on ATA’s intranet:
- An analysis server webpage that __saved engineers time__.
- A WYSIWYG floor plan editor that made maintaining online floor plans __easy for HR__.
- Upgraded, customized and __enhanced__ ATA's software issue-reporting website and timesheet application.
# UC Simulation Center with Procter & Gamble.
Cincinnati, OH.
Mar 29 - Sept 17, 2011
How I benefited P&G:
- Ported 15,000 lines of undocumented C++ code from 32-bit Windows to 64-bit Linux.
- This __reduced simulation time__ and __simplified the simulation process__ by allowing the entire process run on their Linux cluster.
- __Documented the code__, uncovering the equations and assumptions used by the model that was previously a black box.
- Wrote a proof-of-concept tool to import geometry from a proprietary design program into the simulation.
- Laid the foundation for tighter collaboration between P&G designers and simulators.
# Drexel University
TODO
# Mobile Ad Monitor
TODO
# Swordfish Web Solutions
TODO